How the Southside Works Solved their Double-Stacked Problem

When the Southside Works was under construction, the railroad agreed to bury their rail line.

They increased the vertical clearance inside the 1,600 linear-foot-long stretch of the tracks, relocating utilities, improving drainage, and removing overhead structures near both tunnel portals.

Southside Works 1
Before
Southside Works 2
After

Look how beautiful!

This might be an option to cover the trough and ‘heal the wound’ that now cuts through Allegheny Commons.